
Loading photograph
Preparing the 3D view
Preparing lighting and the first complete frame…
Model scale
Invented 6 × 4 km catchments. relief ×2. three selected stages.
Before capture: two separate drainage routes.
How to read these results
The gold arrow shows headward extension, opposite the captor’s downstream flow. Stages are selected geometry, not a dated erosion simulation. Play follows the current water route.
River capture
Explain how headward erosion can divert a river’s headwaters and identify evidence left in the old channel.
Drag to rotate. Hold Ctrl and scroll to zoom, or pinch on a touch screen.